Past Projects
Project List
Brick Center Substation
Gill Ranch Storage Substation
Ryan Dam GSU Transformer Replacement
|
SUBSTATIONS
| Project Name |
Location |
Project Description |
| Willoby Substation |
Kersey, CO |
New 115kV substation with future 230kV site for Western Area Power Administration. |
| North Park Substation |
Walden, CO |
Addition to existing 230 kV Substation. |
| Pronghorn Substation |
Bellfield, ND |
New 115kV-4160 substation for oil-drilling facility and gas plant. |
| Pima Substation |
Pima, AZ |
New 69kV-12.47/7.2kV substation, including site preparation, concrete foundations, fence, and installation of a step-down transformer with four outgoing feeders. |
| Fairgrounds Substation |
Brighton, CO |
New 230kV substation consisting of site preparation and fence by owner with IEC installing concrete foundations, steel structures, bus system, control, etc. |
| Nyberg Substation |
Pueblo, CO |
New switchyard to accommodate switching of new 115kV transmission line. |
| West Substation |
Pueblo, CO |
Additions to existing 230kV substation to accommodate new transmission line. |
| Hawkins Substation |
Hawkins, TX |
New 138kV-12.47kV substation to provide power to the new Nitrogen Rejection Unit for the Exxon Mobile Production Company. Site work and concrete foundations were excluded. |
| Climax Mine Substation, Phase II |
Fremont Pass, Leadville, CO |
New substation for mine site located at 11,300’ altitude at Fremont Pass. Included two new 50 MVA 115kV-13.8kV transformers (furnished by us under Phase I; see Job #300) and 15kV power feeders to mine loads. |
| Dennehotso Substation Retrofit |
Dennehotso, AZ |
Upgrade to existing 69kV substation, including new transformer, circuit switcher, and distribution bay. |
| Hotchkiss Substation |
Hotchkiss, CO |
Improvements to existing 115kV-46kV substation. Owner furnished a mobile sub leaving the 46kV live. IEC replaced concrete foundations, installed new 115kV and 46kV equipment, bus system, control system. |
| Greater Sand Hill Substation |
Alamosa, CO |
Constructed new substation for Solar Farm and 25kV AC Power Collection System, including inverters and transformers. Installed 480v cabling for drive motors. |
| Flat Water Wind Project Substation |
Dubois, NE |
Constructed new substation for RES America Construction, Inc. 161-34.5kV yard with 75 MVA transformer. Project included concrete foundations, steel structures, control building, and bus system. |
| Spurlock Substation |
Sun Ray, TX |
Constructed new substation for Rita Blanca Electric Co-op. 115-24.9kV yard with 22.4 MVA transformer. Project included concrete foundations, steel structures, control building, and bus system. |
| Exum Substation |
Dalhart, TX |
Constructed new substation for Rita Blanca Electric Co-op. 115-24.9kV yard with 22.4 MVA transformer. Project included concrete foundations, steel structures, control building, and bus system. |
| Hewlett-Packard Substations I & II |
Colorado Springs, CO |
Constructed two 34.5-12.47kV 32 MVA substations for new Hewlett Packard plant. Project included concrete work, setting equipment and steel, and setting 15kV pre-engineered building at each site. |
| Sipres Substation |
Brighton , CO |
Constructed new 230/13.2kV substation yard, including grading, concrete foundations, steel structure, bus system, and grounding for United Power and Tri-State (co-owners). |
| North Glenwood Substation |
Glenwood Springs, CO |
Demolished existing substation and built new 24kV substation in its place. |
| Shiprock Substation KU1A Transformer Replacement |
Waterflow , NM |
Disassembled 600 MVA transformer, shipping from Maricopa County, AZ to San Juan County, NM. Reassembled the same transformer. Constructed new steel structures, concrete foundations, bus systems, etc. Project included complete demolition of damaged 300 MVA transformer. Project for Western Area Power Administration. |
| Miracle Mile Substation |
Alcova, WY |
Made modifications and additions to existing 230kV-115kV substation for Western Area Power Administration. |
| Gill Ranch Storage Substation |
Madera, CA |
Design/build 115kV substation as part of a new natural gas compressor facility, including new 15kV switchgear, new PDC building, extensive concrete work including elevated piers for PDC building and fire walls, two new 115kV circuit breakers, six disconnect switches, substation steel and bus system. |
| Fairplay Substation |
Fairplay , CO |
Constructed new 115kV substation for Intermountain Rural Electric Association, including demolition/salvage of existing substation. |
| Shiprock #3 Substation |
Shiprock, NM |
Constructed new 115-24.9/14.4kV substation with a 115kV three ring breaker bus, allowing for a second transformer. Project included site preparation, concrete foundations, control building, fence, and necessary equipment. |
| Victory Substation |
Bennett, CO |
Constructed new 115-12.47/7.2kV substation, including site preparation, foundations, steel erection, grounding, cable system, conduit, and control building. |
| Blanco Substation |
Bloomfield, NM |
Constructed new 115-25kV substation with a 12/16/20 MVA transformer. Project included site preparation, concrete, fence, and control building. |
| North Park Substation |
Walden, CO |
Constructed new 230kV to 25/14.4kV substation, including site preparation, foundations, grounding, conduit, cable systems, bus work, and control building. |
| West Bravo Substation |
Mosquero, NM |
Constructed new 115kV-13.8kV step down substation for Springer Electrical Cooperative and the Hess Corporation. |
| Turley Switching Station |
Blanco, NM |
Joint venture between Jemez Mountain Electric Cooperative and Farmington Electric Utility System. Constructed new 115kV switching station with three 115kV breakers. |
| Climax Mine Substation |
Leadville, CO |
Design/Build project (including all civil and electrical design) for new 115kV substation for FreePort McMoRan as part of the Climax Mine expansion. Project construction was postponed; however, the engineering design was completed to allow for future construction. |
| Brick Center Substation |
Bennett, CO |
Constructed new 230-115kV substation. |
| Kelker Substation |
Colorado Springs, CO |
Constructed CMU wall around existing substation. Also included grounding, lighting, and security system additions and modifications. |
| Raderville Substation Stage 02 |
Waltman, WY |
Made modifications and additions to existing 115kV substation for the Western Area Power Administration. Included three government furnished interrupter switches, four disconnect switches, six surge arresters, concrete foundations, steel structures, control wiring, ground grid and conduit. |
| Sante Fe Substation |
Colorado Springs, CO |
Constructed new 115kV to 13.2kV substation for Colorado Springs Utilities. |
| Schramm Substation, Yuma Tap and Transmission Line |
Yuma, CO |
Constructed new 115kV substation, including 115kV tap and transmission line, transformer, control building, switches, feeders, control wiring, station grounding, aluminum bus, fence, gravel, mile transmission line, and take off structures. |
| Daniels Park Substation |
Castle Rock, CO |
Retrofitted existing 230kV substation to accommodate 115kV feeds for the Intermountain Rural Electric Association (IREA). Included transformer, breaker, gang switches, control building, control wiring, yard grounding, feeders, and CTs. |
| Burnside Transmission Substation |
Ganado, AZ |
Constructed new 115kV-69kV transmission substation located on the Navajo Reservation. |
| Ramah Substation, Zuni Substation Additions & Ramah Breaker |
Ramah and Zuni, AZ |
Constructed new 69kV substation at Ramah, New Mexico and made modifications to existing 69kV Zuni substation at Zuni, New Mexico near Gallup, New Mexico. |
| Spindle Hill Substation |
Fredrick, CO |
Constructed new 115kV switch yard, including breakers, take off structures, fence, gravel, PTs, CTs, switches, control building, and control wiring. Sub-contractor to Aubrey Silvey Enterprises. |
| Flying Horse Substation |
Colorado Springs, CO |
Constructed new 115kV substation for Colorado Springs Utilities. |
| Military Highway, Sixth Street, South Plant, and Power Plant Substations |
Brownsville, TX |
Constructed two new substations and modified two existing substations simultaneously. Included transporting two 60 MVA power transformers from Military Highway Station to Power Plant Station. 138.69kV-12.5kV stations. |
| Salt Creek Substation |
Midwest , WY |
Constructed new 100 MW substation for Anadarko Petroleum Corporations Salt Creek oil field including two 50 MVA transformers. 230kV-34.5kV. Project included moving approximately 85,000 cubic yards of dirt. |
| Hi-Line Substation |
Pharr, TX |
Constructed new 138kV-12.5/7.2kV substation for the Magic Valley Electric Co-op. Included one power transformer, six feeder bays, two 138kV power circuit breakers, six 15kV breakers, and one new control building. |
| Duran, Torrance, and Mid-America Substations |
Central New Mexico, NM |
Constructed three separate substations simultaneously for the Central New Mexico Electric Co-op. Included two 5 MVA power transformers, one 10/12.5 MVA power transformer, and one 7.5 MVA power transformer. These substations were 115-34.5/19.9kV, 115-34.5/24.94kV, and 24.94-4.16/2.4kV. Constructed one new control building. |
| Gering Substation Station Service Replacement |
Gering , NB |
Installed two new 500 KVA transformers and switchgear line-up including feeders to provide new station service power to the Gering substation (for the Western Area Power Administration/WAPA). |
| Antelope Coal Company Substation |
Wright, WY |
Constructed new 69kV-34.5kV substation. |
| Biosphere II Substation |
Oracle, AZ |
Constructed new 69/12.47kV substation, including four 69kV breakers, one 20/25 MVA power transformer, three 600 amp reclosers, and one new control building. Included installation of 29 count 80 owner-furnished steel poles for 2 miles of transmission line. |
| West Edinburg Substation |
Edinburg, TX |
Expanded substation with 138kV breaker addition for the Magic Valley Electric Co-op. |
| Y-W Electric Association |
Eastern Colorado, CO |
Additions to four different existing substations. |
| Hooper Substation |
Alamosa, CO |
Upgraded existing 69kV/12.47kV substation to a 69kV/25kV substation |
| Indian Creek Substation |
Buffalo, WY |
Constructed new 69-24.9kV substation for Powder River Energy Corporation |
| East Substation/City of Ft. Morgan |
Ft. Morgan, CO |
12kV upgrade to existing East Substation. |
| Chilchinbito Substation |
Kayenta, AZ |
Constructed new 1500 KVA, 69-24.9kV substation for the Navajo Housing Authority. |
| Platte Substation |
Sterling, CO |
Constructed new 69kV/12.47kV substation. |
| Forest Lakes Substation |
Monument, CO |
Additions to existing substation, 115kV-12.47kV. |
| Paddock Substation |
Falcon, CO |
Constructed new 69kV-12.47kV substation. |
| Rainsville Substation |
Mora, NM |
Constructed new 115/14.4/24.9kV substation with a 7500 KVA transformer for the Mora-San Miguel Electric Co-op. |
| Barlow Road Substation--City of Ft. Morgan |
Ft. Morgan, CO |
Constructed new 115kV-12.5kV substation and distribution system. |
| Lamar Substation--City of Lamar |
Lamar, CO |
Constructed new 115kV substation and distribution system. |
| Blue Spruce Energy Center--Aubrey Silvey Enterprises, Inc. |
Aurora, CO |
Constructed new 230kV switching station |
| Windsor Substation |
Windsor, CO |
Expanded existing substation for the Poudre Valley REA, including addition of a 40 MVA transformer and distribution system. |
| James L. Green Substation |
Thornton, CO |
Constructed new 230kV 12.47kV substation and distribution system. |
| PG&E |
Golden, CO |
Constructed new 230kV switching station. |
| Lost Cabin Gas Plant #3 |
Lysite, WY |
Constructed new 69kV substation including four 10.5 MVA transformers. |
| South Canal Substation |
Montrose, CO |
Constructed new 115kV substation. |
| El Paso Substation |
Durango, CO |
Constructed new 115kV substation for the La Plata Electric Association. |
| Gallegos Pumping Plant |
Farmington, NM |
Constructed new pumping plant for the Bureau of Reclamation, including associated 230kV substation and two 60 MVA transformers. |
DISTRIBUTION
| Project Name |
Location |
Project Description |
| Dine College, Navajo Nation |
Tsaile, AZ |
Upgraded underground distribution system, 25kV primary and 600v secondary. |
| BT Construction/University of Colorado Health Sciences Center--Fitzsimmons Campus |
Aurora, CO |
Installed 15kV distribution system. |
| National Wildlife Research Center |
Fort Collins, CO |
Installed 13.8kV distribution system, including 10 manholes and a communication infrastructure. |
| Colorado State University |
Fort Collins, CO |
Replaced overhead system with new 15kV underground distribution system. |
| Higher Education and Technology (H.E.A.T.) |
Aurora, CO |
Installed campus-wide underground telecommunications infrastructure. |
| University of Colorado Health Sciences Center |
Aurora, CO |
Installed campus-wide telecommunication infrastructure, including 25 manholes and 7000 feet of concrete-encased duct bank. |
| Mountain Parks Electric |
Granby, CO |
Installed distribution cable system from Fraser Substation to Winter Park, Colorado. |
| National Renewable Energy Laboratory |
Golden, CO |
Installed 15kV underground distribution system. |
| Supai Indian Village |
Supai, AZ |
Installed 25kV primary and 480 secondary electrical circuits with associated transformers and sectionalizing switches (for the Bureau of Indian Affairs). Three major helicopter mobilizations required. |
| Eastman Kodak Company (Multiple Jobs) |
Windsor, CO |
Removed and replaced 350 MCM, 15kV cable (all three projects). |
| US Air Force Academy (Multiple Jobs) |
Colorado Springs, CO |
Replaced 15kV underground cable and switchgear; replaced 15kV feeders including circuit interrupters and sectionalizing switches; installed 15kV feeders including circuit interrupters and sectionalizing switches; installed eight manholes, 15kV primary distribution system equipment and feeders (respectively). |
INDUSTRIAL
| Project Name |
Location |
Project Description |
| CDOT Eisenhower Tunnel Switchgear Replacement |
Eisenhower and Johnson Tunnel, CO |
Replaced 480v switchgear. |
| Ryan GSU Transformer Replacement Project |
Great Falls, MT |
Removed existing single phase transformers in the historic Ryan Powerhouse located on the Missouri River. Installed two new 30/40/50 MVA transformers, as well as associated new 15kV switchgear, feeders and control system. Also, included installation of two new 100kV circuit switchers and associated bus systems. |
| Wyoming Department of Transportation |
Pindale-Daniel Junction Sublette County, WY |
Installed Intelligent Transportation System with animal detectors and variable message signs. |
| Regional Transportation District (RTD)--see #244 |
Denver, CO |
Furnished and installed 24 new Powell 3000 amp DC free-standing circuit breakers, which required interfacing with existing Siemens switchgear, as well as modifying the existing transfer-trip system. Work-outages had to be coordinated with RTD to maintain operability of light rail system. |
| Central Utility Plant--Sempra Energy Solutions--Phase II Expansion |
Aurora, CO |
Installed switchgear (600v, 5kV, 15kV) and completed other electrical systems for the new chiller/boiler plant. Also completed first expansion of the system, including additional motor control centers and equipment. |
| Fountain Valley Authority/Colorado Springs Utilities |
Four sites between Colorado Springs and Pueblo, CO |
Replaced medium voltage pumps, switchgear, and feeders at four water pumping plants. |
| Regional Transportation District (RTD) |
Denver, CO |
Furnished and installed 24 new Powell 3000 amp DC free-standing circuit breakers, which required interfacing with existing Siemens switchgear, as well as modifying the existing transfer-trip system. Work-outages had to be coordinated with RTD to maintain operability of light rail system. |
| Plains End Generating Station--Wartsila North America |
Golden, CO |
Installed underground duct bank and ground grid system for new 111 MW generating plant. |
| Central Utility Plant--Sempra Energy Solutions |
Aurora, CO |
Installed switchgear (600v, 5kV, 15kV) and completed other electrical systems for the new chiller/boiler plant. Also completed first expansion of the system, including additional motor control centers and equipment. |
| US Air Force Academy |
Colorado Springs, CO |
Repaired and upgraded electrical systems in Arnold Hall, including installation of a new 15kV unit substation. |
| Gallegos Pumping Plant (see Substation line) |
|
|
COMMERCIAL
| Project Name |
Location |
Project Description |
| Front Range Community College |
Westminster, CO |
Replaced six 480v switchboard line-ups and one MCC line-up. |
| Auraria Higher Education Center |
Denver, CO |
Installed new fiber optic network and campus-wide monitoring system.
Installed new fire alarm systems in 22 campus buildings. |
| Chatfield State Parks Campground Loop D |
Chatfield Reservoir, CO |
Installed medium voltage distribution and final service to 44 campsites |
| Jefferson County Airport |
Jefferson County, CO |
Replaced electrical service, lighting, and outlets in 120 aircraft hangers. |
| Auraria-Tivoli Revitalization--Auraria Higher Education Center |
Denver, CO |
Installed new 277/480V lighting system and fixtures at Tivoli Student Union Center. |
| Summit County Justice Center |
Breckenridge, CO |
Replaced all PLC systems, including security cameras, security door controls, inmate monitoring, as well as fire alarm system. |
| National Wildlife Research Center (see Distribution line) |
Fort Collins, CO |
Installed electrical systems in 21 buildings, including 120/208v secondary services, transformers, panel boards, lighting, fire alarm, and convenience power and controls |
| United States Mint |
Denver, CO |
Installed new fire alarm system. |
| Auraria Higher Education Center (Multiple Jobs) |
Denver, CO |
Installed new fire alarm systems in 22 campus buildings. |
|