Past ProjectsProject List
Ryan Dam GSU Transformer Replacement
|
The Brick Center Substation was constructed for Intermountain Rural Electric Association (IREA) and is located in Bennett, Colorado. This 230/115kV substation is fed from a 230kV Xcel transmission line and supplies a 115kV transmissdion line for IREA use.
|