Brick Center Substation

Gill Ranch Storage Substation

Ryan Dam GSU Transformer Replacement

 

The Brick Center Substation was constructed for Intermountain Rural Electric Association (IREA) and is located in Bennett, Colorado.  This 230/115kV substation is fed from a 230kV Xcel transmission line and supplies a 115kV transmissdion line for IREA use.

Work on this substation included the following: installation of one (1) 200 MVA transformer, oil containment, control building, 230kV and 115kV Mitsubishi breakers and one (1) 115kV circuit switcher.



 